Cementless implant, can be used in both total and partial hip arthroplasty.
Consists of 6 components:
Femoral Stem
Centralizer
Restrictor
Changeable Femoral Head
Total Hip Poly Acetabulum
Bipolar Femoral Head for partial hip arthroplasty.
Material: S5A17 Femoral Stem, Titanium Alloy with Titanium coating
H5C00 Changeable Femoral Head, Co-Cr-Mo Alloy
L5A45 Polyethylene Liner, UHMWPE
M5A17total hip metal cup, Titanium Alloy with Titanium coating
A5A10 Acetabular Cup Screw, Titanium Alloy
D1C50 Bipolar Femoral Head Co-Cr-Mo Alloy+ UHMWPE
S5A17 Femoral Stem | 1,2,3,4,5,6,7,7.5,8,8.5 |
H5C00 Changeable Femoral Head | 22/M, 22/L, 28/S, 28/M, 28/L, 28/XL |
L5A45 Polyethylene Liner | 38/22,40/22,42/28, 44/28, 46/28, 48/28, 50/28, 52/28, 54/28 |
M5A17total hip metal cup | 38, 40, 42, 44, 46, 48, 50, 52, 54, 56, 58, 60 |
A5A10 Acetabular Cup Screw | Φ6.5×15, Φ6.5×20,Φ6.5×25,Φ6.5×30,Φ6.5×35,Φ6.5×40 |
D1C50 Bipolar Femoral Head | Φ38/22,Φ40/22, Φ42/22, Φ44/22, Φ46/28, Φ48/28, Φ50/28, Φ52/28, Φ54/28 |
Features & Benefits
*Classic design examined by long period of clinical trials.
*Stem and cup made by wrought titanium alloy, with excellent modular of elastic, high strength, and good biocompatibility.
*Plasma sprayed titanium coating with porous structure on the surface of stem and cup, facilitates in-growth of bone.
*Recommended head/neck ratio design, which enables better ROM (range of motion).
*Anti-rotation scallops for cup and polyethylene liners provide rotational stability.
*Optimized design, implant sizes match anatomical data.
Notes in surgery:
*Cement-less Hip suitable for young-aged patient whose bone has good quality.
*Resistance and chatter from cortical engagement may be used as a signal to cease taper reaming.
*Ensure sequential reaming is completed before broaching. If the broach size is countersunk more than 4mm below the neck resection, re-evaluate the resection level. If the neck resection level is determined to be correct ream up and use the next size broach.
Packaging | Inner. Two layers of the sterile package, both are Tyvek + PETG heat-sealing package, covered by carton and heat shrinkable films External: Standard carton |
Lead Time | 7-21 days |
Delivery | ≤30kg, Door to door (DHL/TNT/UPS/FEDEX/EMS, etc.) > 30 kg, Airport to Airport B air or by sea |